Belfast Metropolitan College
McKinstry Skip Hire were employed to provide waste solutions on the construction of the new Belfast Metropolitan College (BMC) in Belfast's Titanic Quarter.
- From construction to fit out it has set a new benchmark in environmental design
- Very Good BREEAM Rating
- Site Waste Management Plan produced using BRE's Smartwaste online tool
- 95% waste diverted from landfill target Currently achieving 99% across the 3 sections of work (demolition / excavation / construction)
- 100% hardcore crushed and reused on site
- McKinstry appointed as approved waste management contractor
- Only McKinstry allowed to transfer waste off site back to their MRF facility for off site segregating, processing and recycling
- Monthly waste reports produced detailing total tonnage of waste and percentage break down of main waste materials